Case Studies


Moving 24-Metre Over-Length Cargo to Changi T5 for Aztec Steel
Client: Aztec Steel Pte Ltd Sector: Construction & Engineering Engagement: Ongoing, since April 2026 The Challenge Aztec Steel needed multiple over-length items delivered from Singapore port to the Changi T5 project site — including a single piece measuring approximately 24.61 metres. Cargo of that length demands specialized transport planning and equipment simply to move it safely and within regulation. The Solution Eng Lee deployed extended and multi-axle trailers suited to
weicheng2
Sep 171 min read


Heavy-Lift Delivery and Installation of Precast Segments for CCECC-SCB JV
Client: CCECC-SCB JV Sector: Construction & Civil Engineering Engagement: Ongoing, since 2025 The Challenge CCECC-SCB JV first turned to Eng Lee in 2025 after another crane contractor pulled out of a hoisting job because their crane couldn't be positioned on site — Eng Lee stepped in with a 700-ton mobile crane and completed the lift that same day. That job led to an ongoing scope: moving oversized segments and frames from the client's factory to Project J112, some as tall as
huishang9
Sep 101 min read


Multimodal Export of Oversized Gensets to Thailand and Indonesia
Client: S.H. Stainless Steel Contractor Pte Ltd Sector: Manufacturing & Construction Engagement: Ongoing, since 2021 The Challenge S.H. Stainless Steel Contractor needed to export generator sets from their factory to Laem Chabang, Thailand and Jakarta, Indonesia. The gensets exceeded standard road transport limits and triggered route restrictions, meaning each shipment had to be split across standard containers and breakbulk pieces — with individual breakbulk components weigh
huishang9
Sep 11 min read


Delivering Oversized Process Equipment to Tuas South's Integrated Waste Management Facility
Client: UES Holdings Pte Ltd Sector: Environmental Infrastructure Engagement: Q1–Q3 2025 The Challenge UES Holdings needed to deliver and install a set of oversized process equipment — two 10m lime saturators, two 7m saturated lime holding tanks, and three 21m silos — at the Integrated Waste Management Facility (IWMF) in Tuas South. Road restrictions ruled out a straightforward land delivery for several of the units, and the client was weighing whether to assemble on site or
huishang9
Aug 281 min read